Residential Villa
4-BHK Luxury Duplex Villa Vaishali Nagar (Sirsi Rd), Jaipur
Hardness: 840 PPM → <15 PPM
Zero Salt Bridging
Problem: Homeowner with a 3M SFT-150 automatic cabinet softener experienced constant salt bridging with local rock salt and paid ₹1,050/bag via appliance dealers. Matte-black Kohler fittings were heavily scaled.
- Intervention: Cleared brine cabinet, flushed injector venturi, and supplied Crystal Clear 99.7% pure compacted salt tablets.
- Outcome: 100% stain-free bathroom fixtures, zero salt cake formation, and annual salt expenditure reduced by 52%.
RWA / Housing Society
72-Flat High-Rise Society Jagatpura (Mahal Rd), Jaipur
1,180 PPM → <25 PPM
2,000 LPH Plant Protected
Problem: Borewell hardness measured 1,180 PPM. 35 kg of insoluble sand and mud from raw rock salt choked the multiport valve every 45 days, causing severe pressure drops across all flats.
- Intervention: Brine pit desludging, resin acid strip wash, and transition to a monthly scheduled 32-bag pallet supply of IS 797 tablets.
- Outcome: Output hardness stabilized at <25 PPM; monthly salt cost is just ₹222/flat with zero valve failures in 18+ months.
Hospitality & Boilers
45-Room Heritage Boutique Hotel Bani Park & C-Scheme, Jaipur
₹1,150 → ₹460 / Bag
58% Cost Reduction
Problem: 680 PPM tube-well water scaled central hot-water calorifiers and left stiff, greyish bath linens despite heavy commercial detergent dosing.
- Intervention: Switched to quarterly 30-bag pallet deliveries of our IS 797 tablets with batch COA documentation.
- Outcome: Laundry detergent expenditure dropped by 46% (saving ₹1.4 Lakhs/yr) with zero showerhead scaling.
Student Hostel
85-Bed Coaching Student Hostel Landmark City (Kunhari), Kota
740 PPM Hardness
RO Life Extended 6x
Problem: Limestone borewell water choked rooftop solar water heaters and caused a 1,000 LPH drinking-water RO membrane failure every 90 days.
- Intervention: Installed a 200L FRP pre-softener fed with 8 bags/month of compacted salt tablets dispatched via NH-52 transport.
- Outcome: RO membrane lifespan extended from 3 months to 18+ months, completely stopping student hair-fall complaints.
Luxury Resort
Lakefront Wedding Resort & Spa Pichola Belt, Udaipur
920 PPM → <10 PPM
2-Ton Quarterly Supply
Problem: Heavy peak wedding season borewell consumption caused white scaling rings on imported thermostatic rain showers and spa steam generators.
- Intervention: Established a 2-Ton quarterly pallet supply of 99.7% pure pillow tablets with automated midnight brine regeneration.
- Outcome: Continuous <10 PPM soft water across 60 luxury suites, spa boilers, and pool make-up lines.
Industrial Processing
Synthetic Textile Dyeing & Finishing Hamirgarh RIICO, Bhilwara
Process: <5 PPM Strictly
9.5% Fuel Saved
Problem: Hardness leakage (35–50 PPM) from an improperly regenerated softener caused calcium-dye spotting on polyester fabrics and scaled a 4-TPH steam boiler.
- Intervention: Replaced mud-fouled crystal salt with direct factory truckloads of 99.7% pure compacted tablets to guarantee 26.4% brine saturation.
- Outcome: Process hardness held strictly at <5 PPM; boiler blowdown and fuel consumption reduced by 9.5%.
Healthcare & Dialysis
Multi-Speciality Hospital & Dialysis Unit Mansarovar, Jaipur
Zero Silica & Mud
Medical Grade Water
Problem: Pre-treatment RO softener was receiving unwashed raw salt with insolubles that contaminated cartridge pre-filters, threatening hemodialysis water standards.
- Intervention: Upgraded to food-grade vacuum-evaporated 99.7% NaCl tablets with zero insoluble residue and NABL batch analysis report.
- Outcome: Zero particulate fouling on 5-micron pre-filters and consistent compliance with clinical AAMI water standards.
Industrial Pharma
Pharmaceutical Formulation Plant Sitapura RIICO Industrial Area
Full COA Compliance
Audit Approved
Problem: Quality audit cited variance in raw salt purity and missing batch traceability for utility boiler water softening.
- Intervention: Established scheduled monthly deliveries of vacuum-evaporated IS 797 tablets with batch Certificate of Analysis (COA).
- Outcome: 100% audit compliance, zero boiler tube deposition, and documented annual operational savings of ₹64,000.